|
Extention
of Financial Assistance to coir units in the Brown Fibre sector
|
|
SCHEME FOR EXTENSION OF FINANCIAL ASSISTANCE TO COIR UNITS IN THE
BROWN FIBRE SECTOR - TERMS AND CONDITIONS |
|
(Revised vide sanction received from the Ministry of Industry vide letter
No.5(20)/96-Coir dated 7th April, 1999) |
|
|
|
|
| |
|
|
| 1. |
Coir Units desiring to avail of the assistance under the scheme should be registered with the Coir Board under the Coir Industry (R&L) Rules 1958 and also with the Industries Department of the State in which
the Unit is located. |
| 2. |
Assistance under the scheme will be extended only to units outside the cooperative fold. |
| 3. |
The Units for extraction of coir fibre/ spinning of coir yarn should be located in areas with adequate availability of coconut husk/ coir fibre. |
| 4. |
Three phase power supply should be available at the location of the coir extraction unit, except rope/ mats & matting/ corridor mat units. |
| 5. |
The applications for grant of financial assistance under the scheme should be recommended by the General Manager, District Industries Centre of the region in which the unit is located. |
| 6. |
The worksheds shall conform to the type design prescribed by the Coir Board. |
| 7. |
The equipments eligible for assistance under the scheme shall not be below the standards laid down by the Coir Board. |
| 8. |
There will be an overall ceiling of Rs.5 lakhs for Units producing multiple items of coir for computing subsidy. The coir units which are producing multiple items like coir fibre, coir yarn, coir mats and coir matting will be treated as separate units producing these items and the ceiling of subsidy fixed for the respective items will be applied in these cases. |
| 9. |
The ceiling prices of different items of machinery will be fixed by Coir Board after making a fair assessment of probable cost of all components used in the production of machinery items. |
| 10. |
The machinery manufacturers will have to give a performance guarantee for a period of at least one year to the beneficiaries of the financial assistance scheme. The machinery manufacturers have to execute a Bank Guarantee to the extent of Rs.1 lakh to ensure after sales service and steady supply of spare parts by the manufacturers. |
|
| |
|
| |
| QUANTUM OF GRANT ADMISSIBLE |
|
|
Type of Unit |
New units |
Modernisation of units |
|
|
|
25% of the cost of equipments and infrastructural facilities subject to a maximum of (Rupees) |
25% of the cost of
modernisation of
equipment and
infrastructural facilities subject to a maximum of
(Rupees) |
|
1 |
Fibre extraction unit |
1,50,000 |
50,000 |
|
2 |
Rope unit |
40,000 |
20,000 |
|
3 |
Corridor mat unit/
Frame mat unit |
40,000 |
20,000 |
|
4 |
Mats & Matting unit |
60,000 |
30,000 |
|
5 |
Spinning unit
(Traditional ratt) |
40,000 |
20,000 |
|
6
|
Motorised ratt coir yarn
Spinning unit
(Minimum 10 ratts) |
1,00,000 |
50,000 |
|
7 |
Mechanized (Automatic)
Yarn Spinning Unit |
1,50,000 |
50,000 |
|
8 |
Curling unit |
1,00,000 |
50,000 |
|
9 |
Rubberised Coir Unit |
1,50,000 |
50,000 |
|
10 |
Semi automatic loom unit |
1,50,000 |
50,000 |
|
11 |
Powerloom matting unit |
1,50,000 |
50,000 |
|
12 |
Coir pith processing unit |
1,00,000 |
50,000 |
|
13 |
Rubber backing/ edging
unit |
1,50,000 |
50,000 |
|
14 |
Foam/ Latex backing unit |
1,50,000 |
50,000 |
|
15 |
Power generator set/
Diesel Engine |
50,000 |
- |
|
16 |
Coir ply/ matting board unit |
1,50,000 |
50,000 |
|
17 |
Needle felt unit |
1,50,000 |
50,000 |
|
| |
| HIGHLIGHTS |
|
i. Mats and matting units outside the co-operative fold shall be covered under the scheme for grant of financial assistance.
ii. The rate of financial assistance under the scheme would be 25% subject to the limits cited above.
iii. The subsidy under this scheme will be inclusive of any other central subsidy that may be available under any other central subsidy scheme including D.B.A. scheme. |
| |
| 11. The assistance for equipments under the scheme shall be within the following limits of overall cost of each equipments. In the case of fibre extraction units, assistance will be granted only to coir units having installed all the machinery listed in any one of the combinations stipulated. |
| |
| Maximum Permissible Cost of Machinery |
|
| A. Coir Fibre Unit |
|
|
Decorticating Unit
|
Buster / Disintegrator
Beater / Decorticator
Sifter / Revolving Screener
Accessories |
Rs. 3,50,000 |
| |
Defibering Unit
|
Crusher
Defibering Machine (Combing Drum)
Turbo Cleaner
Sifter / Revolving Screener
Conveyer System (Optional) Accessories |
Rs. 5,00,000 |
| B. Bailing Press (applicable to all combinations) Optional |
Rs. 1,15,000 |
| C. Willowing Machine |
Rs. 20,000 |
| D. Soaking Tank (2000 husk capacity) |
Rs. 60,000 |
| E. Diesel Operated Crusher |
Rs.50,000 |
| F. Spinning Ratt (Traditional) per set |
Rs. 2,000 |
| G. Rope Making Wheels each |
Rs. 2,500 |
| H. Corridor Mat Frame and Press |
Rs. 30,000 |
| I. Sinnet Mat / Rope Mat Tables each |
Rs. 1,000 |
| J. Well and Pumpset |
Rs. 25,000 |
| K. Dye Vat (Copper / SS) (100 Kg. Capacity) |
Rs. 30,000 |
| L. Rubberised Coir Units |
|
1. Untwisting Machine
|
Rs. 1,55,000 |
2. Sheet Machine
3. Feeder Conveyor
4. Latex Sprayer
5. Cutting Machine
|
Rs. 19,50,000 |
6. Vulcanizing Chamber
|
Rs. 2,80,000 |
7. Multi Day Light Press
|
Big Size |
Rs. 8,50,000 |
| Small Size |
Rs. 5,75,000 |
8. Bandsaw Machine
|
Big Size |
Rs. 95,000 |
| Small Size |
Rs. 50,000 |
9. Stitching Quilting Machine
|
Rs. 12,00,000 |
| M. Curled Coir Units |
Curling Machine |
Rs. 3,05,000 |
| Hackling Machine |
Rs. 50,000 |
| N. Mechanised Yarn Spinning Units |
|
1. Willowing Machine
2. Silvering Machine
3. Automatic two ply Coir Yarn Spinning Machine
4. Balling maching
5. Rehanking Frame
|
Rs. 20,000
Rs. 50,000
Rs. 40,000
Rs. 7,500
Rs. 1,000 |
| O. Motorised Ratt Spinning Unit |
|
1. Motorised Ratt
2. Willowing Machine
3. Rehanking Frame
4. Coir Fibre Treatment Tanks each
5. Well and Pump set
|
Rs. 10,000
Rs. 20,000
Rs. 1,000
Rs. 35,000
Rs. 25,000 |
| P. Coir Pith Processing Unit |
|
1. Hydraulic Press
2. Rotary Drier
3. Revolving Screener
4. Air Compressor
5. Polythene Sealing Machine
6. Sterilisation Equipment / Accessories
|
Rs. 3,50,000
Rs. 1,50,000
Rs. 35,000
Rs. 25,000
Rs. 5,000
Rs. 1,00,000 |
| Q. Coir Pith Composting Unit |
|
1. Revolving Screener
2. Well and Pumpset
3. Refrigerator / Deep Freezer / Cold Room
4. Sprinkler, Pipeline and Accessories
5. Lab Equipment for Fungal Spa
|
Rs. 35,000
Rs. 25,000
Rs. 25,000
Rs. 20,000
Rs. 1,50,000 |
| R. Semi Automatic Loom Unit |
|
1. Bobbin Winding Machine
2. Quilting Device
|
Rs. 60,000
Rs. 1,000 |
3. Semi Automatic Loom
|
1 metre Width
1.5 metre Width
2 metre Width
4 metre Width |
Rs. 1,50,000
Rs. 2,00,000
Rs. 2,50,000
Rs. 4,00,000 |
4. Dye vat (Copper / SS)
|
Rs. 30,000 |
| S. Powerloom Matting Unit |
|
1. Bobbin Winding Machine
2. Cops Winding Machine
|
Rs. 60,000
Rs. 24,000 |
3. Powerloom
|
1 metre Width
1.5 metre Width
2 metre Width
4 metre Width |
Rs. 10,00,000
Rs. 13,00,000
Rs. 15,00,000
Rs. 30,00,000
|
| T. Latex Backing Unit |
|
1. Foaming Unit (200 - 400 Litre Capacity (SS) 2 Nos.)
2. Spreading Unit
3. Hot Air Vulcanizing Chamber
|
Rs. 35,000
Rs. 50,000
Rs. 6,50,000 |
| U. Rubber Backing and Edging Unit |
|
1. Hot Press
2. Mould Sets of 3 (MS or SS) – 6 Nos.
3. Rubber Mixing Mill
|
Rs. 6,00,000
Rs. 75,000
Rs. 3,00,000 |
| V. Bonded Coir Ply Unit |
|
1. Needled Felt Plant or
2. Untwisting Machine And Sheet Forming Machine
3. Sprayer
4. Drier
5. Hydraulic Press
6. Cutting and Trimming Machine
|
Rs.1,00,00,000
Rs.1,55,000
Rs.19,50,000
Rs. 10,00,000
Rs. 1,10,000
|
| W. Needled Felt Plant |
|
1. Carding Machine
2. Needled Felt Plant
3. Band Saw (big size)
|
Rs. 1,00,000
Rs. 1,00,00,000
Rs. 95,000 |
|
| |
|
| |
12. In the case of installation of power generator sets / Diesel Engines, the financial assistance will be a one time assistance and all coir units using power, whether existing or new units, will be eligible for the assistance. With regard to the generator sets/Diesel Engines the following conditions are applicable:
- The Unit should produce a no objection certificate from the State Electricity Board for installation of generator set as per rules in the State concerned. (applicable only for gensets).
- The capacity of the generator set should be subject to the requirement of the unit as specified in the Registration Certificate.
- The unit should obtain a clearance to the proposal in advance from the Regional Officer of the Coir Board concerned to the State.
- The generator should be used only for the purpose for which it is installed
|
|
13. The grant as admissible under the scheme should be disbursed to the entrepreneur after the unit goes into production.
14. The entrepreneur availing of the grant under the scheme shall not mortgage the assets except to the financial institutions from whom he might have taken loan for the establishment of the unit.
15. The grant will be sanctioned by the Coir Board on the recommendation of a Committee consisting of:
- The Regional Officer / ESO of the Board, or such other Officer as may be nominated by the Chairman, Coir Board.
- The Regional Coir Development Officer or ESO of the Coir Board in the State or neighboring States and
- The General Manager of the District Industries Centre concerned or his nominee not below the rank of an Assistant Director.
16. The Entrepreneur availing of grant will have to execute a bond with the Coir Board, Cochin to the effect that:
- The Machineries / equipment / generator set will be maintained properly.
- Will be used only for running the coir unit.
- Will not be shifted from the approved premises.
- Will not be disposed off without the prior approval of the Board.
- Will be insured for an amount not less than the maount of sibsidy granted by the Coir Board.
- Make available the unit at any time for inspection by the Officers of the Coir Board, or Officers of the Government of the State in which the unit is located.
- Operate the unit for a minimum period of five years.
- Abide by the instructions issued by the Coir Board / Central / State Government in regard to the working of the unit.
- If the conditions laid down are violated, the beneficiary is liable to repay the entire amount of assistance with interest at the rate decided by the Coir Board, to the Secretary, Coir Board, failing which action will be taken against defaulters.
|
|
17. The entrepreneur seeking the grant under the scheme should make available to the Committee all relevant records relating to the construction of the building and the purchase of the machinery so as to enable it to determine the quantum of grant admissible.
18. The grant received under the scheme should be recoverable from the entrepreneur:
- Where the assistance under the scheme has been obtained by misrepresentation as to an essential fact or by furnishing of false information; or
- Where the unit goes out of production within 5 years from the date of commencement of production, except in case where the unit remains out of production for short periods extending to 6 months due to reasons beyond its control, such as shortage of raw material, power etc.
19. A unit which has availed financial assistance would be eligible for financial assistance under modernization only after successful running of the unit for a minimum period of three years. The assistance under modernization scheme will be limited to the new work sheds that are to be put up and new equipments for the unit.
20. New unit is a unit which is registered under the Coir Industry (Registration and Licensing) Rules, 1958 but had not completed 12 months from the date of commencement of production.
21. In case of any disputes with regard to grant of subsidy under the scheme, the decision of the Chairman, Coir Board shall be final.
22. The infrastructure also includes work shed, soaking tank, well and pump set. The accessories include the motor, starter, capacitor, main switch and fuse. |
| |
| EXECUTIVE INSTRUCTIONS |
|
1. The types of design for worksheds of various types of coir units should be as per the minimum requirement of the unit. The ceiling for computation of the subsidy is as follows: |
|
| Types of units |
Ceiling for consideration of subsidy |
| 1. Fibre unit |
Rs. 1,50,000 |
| 2. Spinning unit |
Rs. 60,000 |
| 3. Rope unit |
Rs. 60,000 |
| 4. Mats and Matting unit |
Rs. 75,000 |
| 5. Corridor mats unit |
Rs. 75,000 |
| 6. Rubberised coir unit |
Rs. 1,50,000 |
| 7. Curling unit |
Rs. 1,50,000 |
| 8. Mechanized yarn spinning unit |
Rs. 1,50,000 |
| 9. Others |
Rs. 1,50,000 |
|
| |
2. Further subsidy under the scheme is available for modernization of the existing unit so as to increase productivity only after a period of 3 years.
3. The subsidy will be sanctioned by the Board on recommendation of a committee consisting of:-
- Regional Officer or the authorised ESO attached to the Regional Office,
- Dy. RCDO or the authorised ESO attached to the concerned State, and
- The General Manager, DIC or any other Officer not below the rank of Assistant Director from the Industries Department.
|
|
4. The scheme provides for assistance for modernization of existing coir units. As far as modernization is concerned assistance under the scheme will be limited to new worksheds that are to be put up and new equipments for the unit.
5. For claiming financial assistance separate applications as prescribed should be submitted for each type of unit.
6. In the case of leased land / building the lease deed should be for a minimum period of 10 years.
7. All legal documents in vernacular should be accompanied with legal opinion from a local advocate stating that the documents are in order for availing subsidy from the Board.
8. Claim for financial assistance in respect of machinery will be considered only if the beneficiaries purchase machinery from the coir machinery manufacturers registered with the Coir Board.
9. The copies of all documents in support of the financial assistance should be attested by an authorized Officer of the Board / DIC and countersigned by the RO.
10. The Committee while recommending subsidy has to prepare and attach individual checklist for each equipment, workshed etc. in the prescribed form alongwith other documents, which are included in their recommendation.
11. A second inspection of 5% of the total number of cases recommended will be held by the Senior Accounts Officer or any other officer deputed from Head Office.
12. The Regional Officer concerned will submit monitoring reports at least once in a year in respect of all the coir units availed subsidy from the Board. |
| |
| DOWNLOAD APPLICATION FORMS |
| |
FORM I: Application for claiming financial assistance for modernisation of coir units
FORM II: Application for claiming financial assistance for setting up of new units
FORM III: Application for registration of an industrial Establishment
FORM IV: Application for claiming financial assistance for installation of Power Generator/ Diesel Engine in coir units
FORM V: Application for claiming financial assistance for setting up of coir pith processing units
FORM VI: Application for claiming financial assistance for modernisation of coir pith processing units
FORM VII: Application for renewal of certificate of registration in respect of an industrial establishment |
| |
| DOCUMENTS REQUIRED FOR CLAIMING FINANCIAL ASSISTANCE |
| |
1. Application in Form No. I – for claiming financial assistance for modernization of Coir Units
2. Application in Form No. II – for claiming financial assistance for setting up of New Units
3. Application in Form No. IV – for claiming financial assistance for installation of Power Generator Set / Diesel Engine
4. Application in Form No. V – for claiming financial assistance for setting up of Coir Pith Processing Unit
5. Application in Form No. VI – for claiming financial assistance for modernization of Coir Pith Processing Unit.
6. Details of Coir Board Registration
7. Plan & Estimation of the Building (Approval from Competent authority)
8. Valuation Certificate of the Building from a Chartered Engineer
9. Stability Certificate of the building from a Chartered Engineer for a minimum period of 15 years
10. Valuation Certificate of soaking Tank from a Chartered Engineer
11. Stability Certificate of soaking Tank from a Chartered Engineer
12. Valuation Certificate of Well and Pump set from a Chartered Engineer
13. Sale Deed (if in vernacular should be accompanied by a legal opinion from a local advocate stating that the documents are in order for availing financial assistance from Coir Board)
14. Copy of the permanent SSI Registration
15. Copy of the Partnership Deed
16. Copy of the Lease Agreement (lease deed for minimum period of 10 years)
17. Copy of Power Card
18. Bills / Vouchers and Stamped cash receipts attested by the Bank |
| Back to Schemes Page TOP |
| |
|
|
|
|